Joined
·
46 Posts
Built 20/03/2015 (Friday) Delivered 29/05/2015 This may be a reasonable lead time considering it would have been 34 days on the water.
I was waiting for the sun to appear before taking the pics but I guess this is a little optimistic since it is the 3rd day of winter.
I was waiting for the sun to appear before taking the pics but I guess this is a little optimistic since it is the 3rd day of winter.
Attachments
-
41.8 KB Views: 2,140
-
53 KB Views: 2,139
-
46.1 KB Views: 2,139